Shuttering is used as a temporary mould into which concrete is poured to obtain the desired structural shape on the construction site. Traditional shuttering is fabricated using timber, but it can also be constructed from steel, glass fibre reinforced plastics, and other materials.
Table of Contents
What is shuttering material?
Shuttering is used as a temporary mould into which concrete is poured to obtain the desired structural shape on the construction site. Traditional shuttering is fabricated using timber, but it can also be constructed from steel, glass fibre reinforced plastics, and other materials.

What do you use for concrete shuttering?
Commonly used by the construction industry in the formation of shuttering for casting concrete on site. Often used with plywood and OSB board. The timber used for this type of work is usually lower grade carcasing timber with a planed sawn edge (PSE).
What is shuttering for foundation?
Formwork (shuttering) is a temporary mould to provide support to fresh concrete when placed in structural member until the concrete has set. This helps the structural member to gain sufficient strength to carry its self-load and load from other members.
Which shuttering is best?

Steel shuttering plate is the best type of shuttering because this is watertight shuttering which can bear the load of cement concrete placed on it. This shuttering can be used for horizontal, vertical or any other shape required for the work. It gives a leveled surface which has a good appearance.
Which oil is used in shuttering?
mineral oil
Shuttering Oil or formwork oil is high-quality mineral oil that is applied to the inner surface of formwork before concreting. Shuttering oil is also known as a form or mould release agent.
What is Aluminium shuttering?
Aluminium Formwork System or Mivan Shuttering is a construction system for forming the cast-in-place concrete structures of a building. It is also a system for controlling and scheduling the work of other construction trades such as steel reinforcement, concrete placement, and electrical and mechanical conduits.
What is the difference between formwork and shuttering?
Formwork may be the horizontal or vertical arrangement, made to keep concrete in position until it gains desired strength and shape. Shuttering is a part of formwork. It is a vertical temporary structure which is used to bring concrete in the desired shape. Or Vertical formwork is known as shuttering.
What is the formula of shuttering?
Important Formulae for Calculating Shuttering Area: Perimeter of Square : 4S (S = Length of Side) Perimeter of Rectangle : 2[L+B] (L=Length & B = Breadth) Perimeter of Circle : 2πr (r = Radius of circle)